View Details

Return to the Bids Homepage

Bid Classification: 
Construction
Bid Type:  RFT
Bid Number:  RFT #WWTC 2025-033
Bid Name:  Well 15 Replacement
Bid Status:  Awarded
Bid Awarded Date:  Thu Oct 9, 2025 (EDT)
Bid Closing Date:  Thu Sep 4, 2025 2:00:00 PM (EDT)
Question Deadline:  Mon Aug 25, 2025 4:30:00 PM (EDT)
Duration in months:  3
Negotiation Type:  Refer to project document
Condition for Participation:  Refer to project document
Electronic Auctions:  Not Applicable
Language for Bid Submissions:  English unless specified in the bid document
Submission Type:  Online Submissions Only
Submission Address:  Online Submissions Only
Public Opening:  No
Description: 

The Town of Midland (the “Town”) has a requirement for the supply of all labour, equipment, and materials necessary for the complete and satisfactory drilling, sampling, construction, development and testing of one (1) 203 millimetre (mm) (8-inch) x 305 mm (12-inch) diameter single-cased supply well to yield approximately fifteen (15) litres per second (L/s) (198 Imperial Gallons per Minutes (IGM)) of clear, sand-free water (the “Work”).

 

Well 15 is a 50 m deep groundwater supply well constructed in overburden in April 1985 with a 206 millimeter (mm) inside diameter steel casing to 40.37 metres (m) below ground surface (mbgs), and a 168 mm inside diameter, 0.76 mm (30-slot (0.03-inch)) wire wound stainless steel screen from 40.37 to 46.55 mbgs. A filter pack, composed of 0.61 to 0.80 mm (0.02 to 0.03 inch) diameter silica sand, was placed within the 305 mm diameter annulus from a depth of 35.0 mbgs to 50.0 mbgs. A submersible pump is installed within the well, with an intake depth of 42.0 mbgs based on the last well rehabilitation completed in 2019. Following the initial testing of the well it was determined that the safe yield was at least 15.0 L/sec (Groundwater Solutions Ltd., 1987). 

 

A 50-mm monitoring well (MW 17683) is located approximately 21 m east of Well 15 and three multi-level monitoring wells (Hanly-Manly MW) are located approximately 91.5 m north of Well 15 (see Figure 2, Appendix A). The multi-level monitoring wells were constructed with 32-mm diameter steel pipes with pipe size screens set at depths of 30.25 to 30.97 (shallow), 40.34 to 41.06 (intermediate) and 51.79 to 52.51 (deep) mbgs (Groundwater Solutions Ltd., 1987). 

Well 15 is operated by the Town under Permit to Take Water (PTTW) No. 2406-AKPQ83 for the Midland water supply issued by the Ministry of Environment, Conservation and Parks (MECP) on May 3, 2017. The PTTW allows for a maximum taking rate of 912 litres per minute (1,309,200 litres per day).

 

Due to deteriorating well condition and the decreased yield observed during well rehabilitation and performance testing activities, the Town intends to construct a new well to replace Well 15 at the current site The contract for the work will be between the successful bidder (the “Contractor”) and the Town. The Contractor’s work will be observed by the Town’s Representative (the “Consultant”) who will observe and enforce the contract conditions.

 

 

 

         

Bid Document Access:  Bid document preview, bid opportunity, and award notices are available on the site free of charge. Suppliers are not required to register for a bid opportunity prior to previewing unsecured bid documents. Please note, some documents may be secured and you will be required to register for the bid to download and view the documents. To download secured documents and/or to participate in this opportunity, you will need to have a subscription plan or buy Pay-Per-Bid access for this opportunity (available if you don't have an active subscription).
Trade Agreements:  Show Trade Agreements [+]
Please refer to Tender Description or Tender Documents
Categories:  Show Categories [+]
  • Water and Sewer
    • Wastewater Treatment & Services
    • Water Treatment Chemicals Supplies & Services
    • Well & Water Related Services
    • Watermain Swabbing
    • New or Replacement Water/Sewer Lines
    • Water Meters
  • Construction
    • Drainage
    • Municipal Drains
    • Infrastructure (Wastewater)

Meeting Locations

The following are the meeting times and locations for the bid:


This information is only available to invited bidders and registered plan takers. To view this information you must login to your account.
This information is only available to invited bidders and registered plan takers. To view this information you must login to your account.
This information is only available to invited bidders and registered plan takers. To view this information you must login to your account.

Awarded

The following are the awarded vendors for the bid:

​No Awarded Vendors

Bids Submitted

The following are the unofficial bid results

No submitted bids...

Plan Takers

The following are the plan takers for the bid:

There are no plan takers for this bid.
This information is only available to invited bidders and registered plan takers. To view this information you must login to your account.