View Details
| Bid Classification: |
Construction
|
|---|---|
| Bid Type: | RFP |
| Bid Number: | RFP # ENG 2026-037 |
| Bid Name: | Dominion Ave Reconstruction |
| Bid Status: | Open |
| Bid Closing Date: | Wed Jun 3, 2026 2:00:00 PM (EDT) |
| Question Deadline: | Mon May 18, 2026 12:00:00 PM (EDT) |
| Duration in months: | 3 |
| Negotiation Type: | Refer to project document |
| Condition for Participation: | Refer to project document |
| Electronic Auctions: | Not Applicable |
| Language for Bid Submissions: | English unless specified in the bid document |
| Submission Type: | Online Submissions Only |
| Submission Address: | Online Submissions Only |
| Public Opening: | No |
| Description: |
The Town of Midland is looking to retain a consultant to design and produce construction drawings for the Dominion Avenue reconstruction project in 2026 and 2027 as well as carry out Contract Administration and Inspection duties for construction during 2027 and 2028. The project will be separated into two phases. Phase 1 will include the reconstruction of Dominion Avenue from King Street to Fourth Street and Phase 2 will include the reconstruction of Dominion Avenue from Fourth Street to 840 Dominion Avenue. The design will include:
As part of the design the consultant is to verify the storm system needs for the areas along Dominion where storm sewers are not present and determine if a dedicated storm sewer is required or if alternative drainage methods would be adequate. Any existing drainage issues should be addressed during design. The Town will be undergoing upgrades to the Dominion Water Tower located at 755 Dominion Avenue in 2026 and 2027. Phase 2 of the Dominion Reconstruction Project will start once the water tower upgrades are completed. The proposed consultant shall incorporate upgrades to the water system up to the property line of the water tower location. During the design, a topographic survey will be required as well as a complete Geotechnical Investigation complete but not limited to boreholes and a soil analysis including chemical testing of the base material to determine suitable off site uses. Contract Administration shall include the coordination of all work between the contractor, the Town, and any other regulatory authorities as well as full time inspection. |
| Bid Document Access: | Bid document preview, bid opportunity, and award notices are available on the site free of charge. Suppliers are not required to register for a bid opportunity prior to previewing unsecured bid documents. Please note, some documents may be secured and you will be required to register for the bid to download and view the documents. To download secured documents and/or to participate in this opportunity, you will need to have a subscription plan or buy Pay-Per-Bid access for this opportunity (available if you don't have an active subscription). |
| Trade Agreements: |
Show Trade Agreements [+]
Please refer to Tender Description or Tender Documents
|
| Categories: |
Show Categories [+]
|